Editorial field note written by TechLamp. It describes an approach and contains no statistics or client results. Placeholder content, PENDING PUBLICATION.
Measure the work, not the launch
Go-live dates and user logins say a system exists. They do not say it helps. Choose measures tied to the task the system was meant to improve, such as time to complete a request, rework, or how often people fall back to the old method.
Take a baseline first
Record how the work looked before the change, even roughly. Without a baseline you can only describe the new state, not the difference. A sample of real cases is enough to start.
Keep the list short and review it
Three to five measures are enough. Review them with the people doing the work, and drop any that nobody acts on.